No. Project Name Specific Responsibilities/ Scope of Work Client Name Start Finished
1 Fabrication & Erection Fabrication & Erection of Tank, Vessel, etc. PT. Mitrindo Duta Prakarsa 01-Apr-11 01-Apr-12
2 Turn Around 2011 PT. Pertamina RU II Dumai Turn around – Rigging Pertamina 03-Oct-11 01-Dec-11
3 Turn Around 2011 PT. Pertamina RU II Dumai Turn around – Scafolding Pertamina 27-Oct-11 25-Nov-11
4 Recovery Project – Thailand 2011 Engine Recovery Project PT. Internasional Recovery Services Indonesia 03-Nov-11 Aug-12
5 Construction Work Construction Work PT. Ecco Tannery Indonesia 01-Mar-12 01-Jul-12
6 Operation & Maintenance 900 MW Diesel Power Plant Manpower supply for Operation & Maintenance 900 MW Diesel Power Plant STX Service Singapore Pte. Ltd 11-Jun-12 28-Feb-15
7 RDM Project 2013 Routine Daily Maintenance Electrical Instrument 2013 PT. Chandra Asri Petrochemical 01-Mar-13 28-Feb-14
8 Install new lighting at lay down area Install new lighting at lay down area Styrindo Mono Indonesia 02-Apr-13 15-Jul-13
9 Fabrication of Boiler Fabrication of Boiler PT. Alstom Power Energy Indonesia 21-Nov-13 31-Dec-13
10 Oil Drilling Oil Drilling Services PT. Westindo Utama Karya 18-Dec-13 30-Apr-14
11 RDM Project 2014 Routine Daily Maintenance Electrical Instrument 2014 PT. Chandra Asri Petrochemical 01-Mar-14 28-Feb-15
12 Electric & Instrument Work Electric & Instrument Work Toyo Engineering Corporation 02-Apr-14 Nov-14
13 Recovery Project Supply of Skilled Labor for Electrical & Instrument Work PT. Internasional Recovery Services Indonesia 15-Apr-14 15-May-14
14 Senoro Gas Development Project Piping Construction Work PT. Tripatra Engineers and Contructors 06-Nov-14 31-Mar-15
15 Senoro Gas Development Project Manpower supply for warehouse PT. Tripatra Engineers and Contructors Dec-14 Mar 2015
16 RDM Project 2015 Routine Daily Maintenance Electrical Instrument 2015 PT. Chandra Asri Petrochemical 01-Mar-15 31-Jan-16
17 Senoro Gas Development Project Bolt Tightening work PT. Tripatra Engineers and Contructors 26-Mar-15 24-Apr-15
18 Banyu Urip Project Piping Construction Work PT. Tripatra Engineers and Contructors 15-May-15 29-Jun-16
19 PT. Mewah Industries Project Supply of Skilled Labor for Electrical & Helper Work PT. Internasional Recovery Services Indonesia 16-Jun-15 25-Jul-15
20 ECR TAM 2015 Manpower for Support ECR TAM PT. Chandra Asri Petrochemical 26-Sep-15 30-Oct-15
21 PE TAM 2015 Manpower for Support ECR TAM PT. Chandra Asri Petrochemical 08-Aug-15 31-Dec-15
22 OME TAM 2015 Manpower for Support ECR TAM PT. Chandra Asri Petrochemical 01-Oct-15 30-Nov-15
23 RDM Project 2016 Routine Daily Maintenance Electrical Instrument 2016 PT. Chandra Asri Petrochemical 01-Jan-16 31-Dec-16
24 Project Zocalo Civil & construction works ( Expension of unloading area, WWT, weighing bridge, pipe bridge, etc ) PT. Archroma Indonesia 21-Jun-16 20-Dec-16
25 KOS Project Electrical & Instrument Installation Works PT. Fuji Furukawa E & C Indonesia 26-Aug-16 15-Dec-16
26 Additional CAPC Additional for Routine Daily Maintenance Electrical Instrument 2016 PT. Chandra Asri Petrochemical    
27 Lighting supply Vessel Entry Lighting 12V/24V PT. Indorama Petrochemicals 10-Dec-16 13-Dec-16
28 RDM Project 2017 Routine Daily Maintenance Electrical Instrument 2017 PT. Chandra Asri Petrochemical 01-Jan-17 31-Dec-17
29 Hotel Grand Paragon 6th Floor Recovery for Electrical & Instrument PT. IRS Indonesia 10-Mar-17 31-Mar-17
30 Reblading / Welding Mixer Blade Reblading / Welding Mixer Blade PT. Bangun Beton Indonesia 17-May-17 31-May-17
31 Manufacturing & Installation Screen Hopper BF01 & BF02 Manufacturing & Installation Screen Hopper PT. Merak Energi Indonesia 15-May-17 31-May-17
32 Fabrication level condensate deaerator condensate area boiler Fabrication & installation PT. Tereos FKS Indonesia 10-Aug-17 18-Aug-17
33 Reblading / Welding Mixer Blade Reblading / Welding Mixer Blade PT. Bangun Beton Indonesia 10-Aug-17 31-Aug-17
34 Materials & fabrication of floatator diffuser & floatator spray pipe (A & B) Fabrication PT. Suez Environtment 22-Aug-17 29-Aug-17
35 Pabrikasi Pipe Bridge LPG Refrigerated Tanjung Sekong Pipe Bridge Fabrication Konsorsium PT. Wijaya Karya – Posco Engineering 28-Aug-17 28-Nov-17
36 Installation Pipe Tubing UHP-1 & UHP-2 Installation Pipe Tubing UHP-1 & UHP-2 PT. Pandu Anugerah Analitika 04-Sep-17 08-Sep-17
37 120 KTA SYNTHETIC RUBBER INDONESIA – Aboveground piping & painting works package-1 (WWT Package)
– Punc killing works
– Supply one person piping supervisor
PT. Inti Karya Persada Teknik 30-Aug-17 30-Sep-17
38 fabrication spray pipe nozzle RVF dan fabrication and installation flash dryer drainage area CWM fabrication spray pipe nozzle RVF dan fabrication and installation flash dryer drainage area CWM PT. Tereos FKS Indonesia 08-Sep-17 15-Sep-17
39 Fabrication and Installation reprocess pipe area CWM Fabrication and Installation reprocess pipe area CWM PT. Tereos FKS Indonesia 13-Sep-17 15-Sep-17
40 Starch sampling device flash dryer area Fabrication for strach sampling PT. Tereos FKS Indonesia 13-Sep-17 15-Sep-17
41 Waste Room Fabrication & Installation for Waste Room PT. Nippon Steel & Sumikin Texeng Indonesia 02-Oct-17 17-Oct-17
42 120 KTA SYNTHETIC RUBBER INDONESIA – U3 – Tubing and field instrument installation work
– Additional instrument installation work around 300 pieces
PT. Inti Karya Persada Teknik 2-Oct-17 30-Nov-17
43 120 KTA SYNTHETIC RUBBER INDONESIA – U3 – Instrument Works PT. Inti Karya Persada Teknik 31-Oct-17 Present
44 SRI 3U Project – Replace flange nozzel of tank
– Modification platform C-Press
– Supply automatic sampler tank
– Installation polymer injection pipe & floatator diffuser pipe & anti spray foam pipe
PT. Suez Water Treatment Indonesia 27-Oct-17 Present